Web Content Viewer
Actions

Engineering Guides Notebook

Table of Engineering Guides

Filename & Extension [PDF] Guide Name &
Subject Matter
Date Issued *
Revised Date
Applicable Rule(s) 3745-
Guide 1 Guide 1 - PTI/PTO for non-criteria pollutants Sept. 11, 1979, March 19, 1986*, Nov. 21, 2005*, Oct. 26, 2022* 31-02, 35-02
Guide 2 Guide 2 - Issuance of PTO for SO2 sources Dec. 13, 1979, March 19, 1986*, May 18, 2005* 35-01, 35-02
Guide 3 Guide 3 - Bake-off ovens: incinerator or process? Dec. 13, 1979, March 19, 1986*, May 4, 2005* 17-09
Guide 4 Guide 4 - VOC definition of "Potential to Emit" March 14, 1980, March 19, 1986*, June 22, 2005* 21-01, 21-07, 21-09
Guide 5 Guide 5 - VOC Exemption for fixed roof tanks March 14, 1980, March 20, 1986*, Jan. 4, 2007* 21-04, 21-09
Guide 6 Guide 6 - PTI for coal to oil conversion - Obsolete March 14, 1980, Dec. 5, 2016* 31-01
Guide 7 Guide 7 - "Process Weight" as used in -17-11 March 21, 1980, March 20, 1986*, Jan. 3, 2008* 17-01, 17-11
Guide 8 Guide 8 - Compliance tests at bulk gasoline terminals April 10, 1980, Nov. 25, 1980*, Dec. 17, 1982*, March 7, 2006*, July 28, 2014*, August 2020* 21-10
Guide 9 Guide 9 - PTI/PTO determinations for grain dryers (regarding the applicable requirements for existing and new grain dryers) May 9, 1980, Dec. 24, 2008* 17-08
Guide 10 Guide 10 - Applicable TSP rules for stone crushing plants May, 29, 1980, Nov. 13, 2006* 17-08
Guide 11 Guide 11 - Use of Table I for multiple source permits/de-rating June 20, 1980, March 13, 2007* 17-11
Guide 12 Guide 12 - GDFs-BAT, acceptable equipment for Stage II systems and witnessing tests June 25, 1980, Aug. 14, 2007*, May 20, 2008* 21-09, 31-05
Guide 13 Guide 13 - Procedures for EVEL determinations (reviewed on March 13, 2007, and no significant revisions were made) June 27, 1980, Feb. 27, 1981*, Dec. 23, 1994*, June 20, 1997*, March 13, 2007* 17-07
Guide 14 Guide 14 - Acceptability of past tests for EVELs June 27, 1980, Dec. 23, 1994*, March 13, 2007* 17-07
Guide 15 Guide 15 - Testing procedure to establish EVELs for identical sources (reviewed on March 13, 2007, and no significant revisions were made) July 15, 1980, Feb. 23, 1994*, June 20, 1997*, March 13, 2007* 17-07
Guide 16 Guide 16 - Conditions for requiring additional source compliance tests (regarding when additional emission tests should be required) Aug. 14, 1980, Feb. 6, 1985*, Nov. 9, 1988*, April 30, 1996*, Feb. 2, 2009*,
Aug. 2017*
15-04
Guide 17 Guide 17 - Authority and criteria for requiring compliance tests at normal boiler operating rate Aug. 26, 1980, Nov. 13, 2006* 15-04, 17-07, 17-10, 35-02
Guide 18 Guide 18 - SO2 compliance determination methods for boilers Nov. 14, 1980, Nov. 7, 2016 18-04
Guide 19 Guide 19 - Applicable TSP rules for coke oven battery combustion stacks Dec. 30, 1980, Jan. 3, 2008* 17-10
Guide 20 Guide 20 - Determination of compliance with visible emission limitations for stack sources Jan. 6, 1981, July 28, 2014* 17-03, 17-07
Guide 21 Guide 21 - BAT requirements for fugitive dust sources Jan. 22, 1981, Dec. 2, 2009* 17-08, 31-05
Guide 22 Guide 22 - Acceptability of manual covers for small open top vapor de-greasers and OAC Rule 3745-21-09(O) April 9, 1981, Nov. 9, 2009 21-09
Guide 23 Guide 23 - Determination of significant figures for TSP emission limitations April 24, 1981, Nov. 10, 2021* 17-10, 17-11
Guide 24 Guide 24 - Application of fugitive dust requirements to affected facilities May 8, 1981, July 28, 2014* 17-08
Guide 25 Guide 25 - Determination of source numbers and permit/variance fees for fugitive dust sources June 9, 1981, July 9, 2010* 17-04, 17-08
Guide 26 Guide 26 - Inclusion of weight of water in the weight of "Refuse" charged for incinerators June 9, 1981, July 28, 2014* 15-01, 17-09
Guide 27 Guide 27 - Determination of the heat input during a boiler stack test (regarding the use of the F-factor in emission test calculations) June 9, 1981, Dec. 26, 2008* 17-03
Guide 28 Guide 28 - Methods for ascertaining the uncontrolled mass rate of emission for Figure II of OAC rule 3745-17-11 June 30, 1981, Jan. 5, 2009* 17-11
Guide 29 Guide 29 - Applicability of the PTI rules to increases in capacity of a de-rated boiler Nov. 17, 1981 17-10, 31-02
Guide 30 Guide 30 - Discontinuation of control measures for fugitive dust sources in non-appendix A areas Nov. 17, 1981, Dec. 4, 2009 15-07, 17-08
Guide 31 Guide 31 - Grouping of emissions units in applying Figure II of OAC rule 3745-17-11 Dec. 18, 1981, Dec. 9, 2009 17-11
Guide 32 Guide 32 - When a variance permit may be issued to define alternative visible emission limitations for an emissions unit Jan. 14, 1981, Dec. 14, 2009* 17-07, 31-09
Guide 33 Guide 33 - Evaluation and processing of requests for scheduled maintenance Jan. 14, 1982, May 3, 1982, Feb. 24, 2004 15-06
Guide 34 Guide 34 - Procedures to shut down or reinstate emission units or facilities Jan. 14, 1982, March 12, 2012 31-02, 31-07, 77-08
Guide 35 Guide 35 - Calculation of VOC emissions from fixed and external floating roof storage tanks for the purpose of determining eligibility for registration status March 29, 1982, Dec. 11, 2009 31-08
Guide 36 Guide 36 - The grouping of fuel-burning equipment in determining the allowable emission rate from Figure I of OAC Rule 3745-17-10 March 29, 1982, Dec. 29, 2009* 17-10
Guide 37 Guide 37 - Whether product separation/recovery equipment constitute control equipment May 18, 1982, Aug. 11, 2010 17-11
Guide 38 Reserved    
Guide 39 Guide 39 - Conversion to exempt organic compounds to create emission offsets under the bubble concept and PTI Aug. 25, 1982 21-01, 31-05
Guide 40 Guide 40 - Stack testing methods for particulate emissions from process equipment and incinerators Nov. 5, 1982 17-03, 17-09, 17-11
Guide 41 Guide 41 - Stack testing methods for particulate emissions from fuel-burning equipment Nov. 5, 1982 17-03, 17-10
Guide 42 Guide 42 - Definition of BAT for new sources - Obsolete Dec. 30, 1982,
Feb. 21, 2018
31-05
Guide 43 Guide 43 - Special terms and conditions for PTOs and variances Obsolete 12/20/23

Use Terms and Conditions Library instead.
March 28, 1983, Feb. 6, 1985*, Feb. 20, 1986*, June 1, 1988*, April 18, 1989*, July 25, 1991*, Feb. 7, 1992*, Nov. 7, 1993*, March 2, 1995* 31-05, 31-09
Guide 44 Guide 44 - Portable Source Permitting, Relocation, and Compliance April 5, 1983, April 14, 2006*, April 14, 2010*, May 16, 2016*, May 1, 2019* 31-03
Guide 45 Guide 45 - Calculation of "Potential to Emit" for surface coating lines
Painting-Coating PTE Calculator
Nov. 7, 2017 Oct. 21, 1983* 21-01, 21-07, 21-09
Guide 46 Guide 46 - Determination of cost-effectiveness for BAT and RACM evaluations - Obsolete Use U.S. EPA’s Air Pollution Control Cost Manual. Dec. 5, 1983, July 26, 2022 17-08, 31-05
Guide 47 Guide 47 - Application of TSP emission limitations to cyclones at alfalfa dehydrating plants Nov. 30, 1984 17-11
Guide 48 Guide 48 - VOC compliance determinations for coating lines Nov. 7, 2017 Nov. 30, 1984* 21-09
Guide 49 Guide 49 - Particulate emission testing during boiler soot-blowing operations Dec. 17, 1985 17-10
Guide 50 Guide 50 - Use of waste oils for road dust suppression Feb. 11, 1986, May 7, 1999* 17-08
Guide 51 Guide 51 - Number of sampling runs to be witnessed by agency observers
Please see the Standard Operating Procedure (SOP) here
Feb. 14, 1986, Sept. 12, 2014, March 1, 2019* 17-03
Guide 52 Guide 52 - Criteria for requiring the use of continuous emission monitors Feb. 14, 1986, Dec. 11, 1991*, April 3, 1996* 15-04
Guide 53 Guide 53 - Interpretation of open burning standards - 06/19/2018 obsolete - Click here for guidance on open burning. Dec. 17, 1986, Feb. 20, 1992*, July 22, 1994* 19-01, 19-03, 19-04, 19-05
Guide 54 Guide 54 - Use of brine for road dust suppression Jan. 13, 1987 15-07, 17-08
Guide 55 Guide 55 - Precautions in use of Method 24 for water-based coatings March 15, 1989, July 28, 2014* 21-10
Guide 56 Guide 56 - Regulation and control of emissions from heatset web offset printing lines March 16, 1990, June 15, 1999* 17-03, 17-07, 17-11, 21-01, 21-07, 21-10, 31-05
Guide 57 Guide 57 - Reasonably available control measures for fugitive dust emissions from highway construction and maintenance projects Dec. 9, 1992, April 3, 1996*, Sept. 5, 1996*, Jan. 12, 2021* 17-08
Guide 58 Guide 58 - Definition of "Facility" for Ohio Title V permit program - follow the rule definitions (click here) and U.S. EPA's guidance concerning "facility" decisions (click here). March 31, 1995 77-01
Guide 59 Guide 59 - Identification of required fields in a Title V permit application Dec. 27, 1995 77-03
Guide 60 Guide 60 - Assigning source numbers and PTI fees for processes subject to leak detection programs March 2, 1995 21-09, 31-02
Guide 61 Guide 61 - Policy on limiting potential to emit of a facility to avoid Title V permit applicability. Please check the Aug. 20, 1998 update concerning extension of deadline for FESOPs April 27, 1995, Nov. 6, 1995*, Sept. 5, 2006* 77-01, 31-05
Guide 62 Guide 62 - Identification of trivial air contaminant emission activities for preparing Title V permit applications April 27, 1995, Nov. 6, 1995* 77-01, 15-05
Guide 63 Guide 63 - Guidance on the need to revise Title V permit applications for changes in federally required information Aug. 29, 1995, June 3, 2003* 77-01, 77-04, 77-07, 77-08
Guide 64 Guide 64 - Clarification on addressing emergency action plan requirements in Title V permit applications Oct. 24, 1995 25-03
Guide 65 Guide 65 - Monitoring, record-keeping and reporting requirements for various types emission units - 06/19/2018 obsolete - See the Terms and Conditions Library for appropriate terms and conditions. May 17, 1996, Nov. 1, 1996* 77-03, 77-04
Guide 66 Guide 66 - Continuous parametric monitoring systems (CPMS) requirements for emissions units Sept. 18, 1996 21-07, 21-08, 21-09, 31-05
Guide 67 Guide 67 - A new guide that provides guidance on how U.S. EPA's "Once In, Always In" policy affects the applicability of a Maximum Achievable Control Technology ("MACT") standard to a facility and the requirement that the facility obtain a Title V permit to comply with the MACT standard. A number of questions regarding this subject are answered - Obsolete; policy withdrawn Feb. 28, 2005
Jan. 25, 2018*
 
Guide 68 Guide 68 - Calculation of potential to emit (PTE) for non-heatset or sheet-fed printing presses to determine eligibility for PTI exemption July 7, 1997 31-03
Guide 69 Guide 69 - Air dispersion modeling guidance Table 3 July 1, 2003, July 28, 2014*, Nov. 14, 2018 31-25
Guide 70 Guide 70 - Guidance on evaluating emissions of toxic air pollution compounds when processing Permit-to-Install (PTI) applications
Hodanbosi Memo
May 9, 2017 31-05, 114-01
Guide 71 Guide 71 - Requirements for reporting emissions from very small emissions units in the annual fee emission reports Aug. 6, 2001, Jan. 23, 2003*, Jan. 6, 2011* 15-05, 78-02
Guide 72 Guide 72 - Guidance on when it is appropriate for the regulated community to group emissions unit IDs for certain emissions reporting purposes Revoked Dec. 30, 2009 - Refer to eBusiness Center: Air Services emissions reporting electronic "Help" pages for assistance - Revoked Dec. 30, 2009 Jan. 30, 2004  
Guide 73 Guide 73 - Answers several questions concerning procedures and policy on visible emission observations by field inspectors and the use of visible emission test methods April 27, 2005 17-03, 17-07
Guide 74 Condensable and non-condensable particulate matter May 9, 2017 17-01, 17-03, 17-07, 17-09, 17-10, 17-11, 31-05, NSPS and NESHAPS
Guide 75 Guide 75 - Prepared in response to numerous questions from the Ohio EPA District Offices and Local Air Agencies and the regulated community concerning the proper application of OAC rules 3745-17-07, 3745-17-08, and 3745-17-11 to fugitive dust sources and/or process equipment March 6, 2009 17-07, 17-08, 17-11
Guide 76 Guide 76 - Ohio EPA's policy for incorporating MACT, NESHAP and NSPS requirements in Ohio air permits March 11, 2008  
Guide 77 Guide 77 - Prepared to address questions from the Ohio EPA District Offices and Local Air Agencies and the regulated community concerning the proper application of amended OAC rule 3745-21-07 to emissions units that generate organic compound emissions Aug. 24, 2009 21-07
Guide 78 Guide 78 - Describes procedures used for owner or operators of municipal waste landfills to obtain either alternative timeline or higher operating collection well temperature, oxygen, nitrogen or pressure requirements Dec. 15, 2010 NSPS WWW
Guide 79 Guide 79 - Explains the procedure to follow upon receipt of a permit application requiring emission reductions or Emission Reduction Credits (ERCs) for the purpose of offsets or a permit application requiring emission reductions or ERCs for netting April 4, 2011 111-01, 111-02, 111-03, 111-04, 111-05, 31-22, 31-24, 31-25, 31-26, 31-27
Guide 80 Guide 80 - Methods for calculating potential to emit (PTE) March 2, 2012 15-05, 21-12, 31-01, 31-03, 31-05,77-01, MACT, NNSR, PSD, USEPA Final Rule 11-12, 67FR 80186-01
Guide 81 Guide 81 - Emission unit ID assignment March 12, 2012 17-01, 21-07
Guide 82 Guide 82 - Ultra low sulfur diesel fuel permitting flexibility Sept. 17, 2014, Oct. 1, 2014* 31-05
Guide 83 Emission Testing Production Rates for Asphalt Plants April 25, 2017, Jan. 8, 2019*, April 29, 2019* 15-04, 31-05
Guide 85 Guide 85 - July 2014 greenhouse gas air pollution permitting changes Aug. 26, 2014 31-34, 77-11
Guide 86 Guide 86 - Guidance concerning appropriate 31-05 rule citations Nov. 12, 2014 31-05
Guide 87 Guide 87 - Guidance concerning rule citations for the <10 tons/year BAT exemption Nov. 12, 2014, June 5, 2015* 31-05
Guide 88 Guide 88 - MACT and GACT Guidance Feb. 25, 2016, March 21, 2018*,
April 10, 2018*
40 CFR Part 63 (MACT)
Guide 89 Guide 89 – Determining When a Best Available Technology Cost-Effectiveness Study is Needed Nov. 4, 1999 (Draft), February 1, 2016 31-05
Guide 90 Guide 90 – Guidance for Law Enforcement Agencies in Managing Pharmaceutical Waste and Contraband - Obsolete - See U.S. EPA guidance below. Sep. 26, 2017 40 CFR Part 60, Subpart EEEE
Guide 91 Guide 91- Guidance for Replacing Components of Complex Operations July 16, 2020 17-11, 31-01, 31-02
Guide 92 Guide 92 - Process for Evaluation of Operation of Source Without Controls Guidance Nov. 1, 2019* 15-06
Guide 94 Guide 94 - Recommended Emissions Tests for Asphalt Plants Sept. 2, 2021 31-05 and 40 CFR Subpart I (NSPS)
Guide 95 Guide 95 - General Permit Fees Nov. 8, 2022  

Other Permitting Guidance

Keyword Index

Keyword(s) Applicable Engineering
Guide Number
(.pdf or .html)
A
Ambient air monitoring (particulate matter) 43
Aggregate plants 10
Alfalfa dehydrating plants 47
Asphalt plants 83
B
Bake-off ovens 3
Best available technology (BAT) -
....continuous parametric monitoring systems 66
....cost-effectiveness of 46, 89
....definition -
....fugitive dust sources 21
....gasoline dispensing facilities 12
....grain dryers 9
....heatset web offset printing lines 56
....rule citations 86, 87
Brine (for dust control) 54
Bubble concept 39 & 48
Bulk gasoline terminals 8
C
Capture efficiency (for dryers) 56
Cleanup materials (for printing lines) 56 & 68
Coal quality -
....specifications 43
....sampling/analysis/reporting 43
Coke oven batteries 19
....combustion stacks 19
Column dryers 9
Compliance demonstrations 8, 16, 17, 18, 24, 27, 28, 43, 48, 49 & 51
Condensible emissions 40, 41 & 56
Continuous emission monitors 18, 43 & 52
Continuous parametric monitoring systems 66
Contraband 90
Control equipment 37
....general 37 & 66
....storage tanks 35
....heatset web offset printing lines 56
Cost-effectiveness 24, 46 & 89
Cost -
....capital 46
....annual 46
Cyclones 47
D
De-greasers (open-top vapor de-greasers) 22
De-rating (of fuel burning equipment) 29, 36 & 43
Deterioration ("significant and avoidable") 30
Dispersion Modeling 69
Drugs 90
Dryers (for heatset inks) 56
Dust suppressants 50 & 54
E
Emission activities -
....de minimus 62
....insignificant 62
....trivial 62
Emission factors 28
Emission limitations -
....particulate 36
....in PTO's and variances 43
Emission offset (organic compounds) 39
Emission tests -
....asphalt plants 83
....capture efficiency 56
....general 46 & 51
....organic compounds 8, 43 & 56
....particulates 13, 14, 15, 17, 27, 28, 32, 40, 41, 43, 47, 49 & 56
....sulfur dioxide 18
Emergency generators (potential to emit) 61
Emergency Action plans 64
Emission units  
....assigning ID # 60
....dispersion modeling of 69
....continuous paremetric monitoring systems 66
Equivalent visible emission limitations (EVEL's) 13, 14, 15, 17, 43 & 56
Exempt organic compounds 4, 39 & 56
F
Facility 58
Fees 25, 60, 61, 71
F-factor 27
Fuel burning equipment 17, 19, 27, 29 & 41
....de-rating 36 & 43
....grouping 36
....new sources 36
....physically & operationally united 31
....soot-blowing operations 49
....stand-by equipment 36
Fuel sampling 18, 82
Fugitive dust 10, 21, 24, 25, 30, 43, 50, 54 & 57
G
Gasoline dispensing facilities 12
Grain dryers 9
Greenhouse Gas 85
Grouping  
....of fuel burning equipment 36
....of process sources 11 & 31
H
Heat balances 27
Heatset web offset printing lines (HWOPL's) 56
Highway construction and maintenance projects (dust) 57
I
Inactive sources 34
Incinerators -
....general 3 & 40
....liquid wastes 26
....sewage sludge 26
Inherent physical limitation 61
Insignificant activities 62
L
Leak detection programs (for process fugitive VOC emissions) 60
Lithographic Printing 56 & 68
Landfill 78
M
Maintenance 33 & 43
Malfunctions 16, 43, 92
....operate without controls 92
....temporarily operate without controls 92
Material balances 28
Mobile facilities (relocation of ) 44
Modeling (of air contaminant sources) 69
Modifications (of existing sources) 16, 29 & 31
N
New Sources -
....fuel burning equipment 36
Non-criteria pollutants 1
O
Opacity 13, 14, 15, 16, 17, 20, 24 & 32
Organic compounds 4, 39, 56 & 68
Organic materials 56
P
Parametric monitoring requirements 66
Parking areas (unpaved) 50 & 54
Permits (state) -
....to install, PTI 1, 12, 21, 29, 34, 44, 60 & 68
....to install, exemption, printing lines 68
....federally enforceable state operating permit 61
....to operate, PTO 1, 2, 5, 8, 13, 14, 15, 16, 19, 24, 25, 29, 31, 34, 43 & 44
Permits (Title V) -
....applicability determination 61 & 62
....changes to application fields 63
....definition of "facility" 58
....emergency action plans 64
....fees 61
....inherent physical limitation 61
....insignificant activities 61 & 62
....modifications of 63
....permit shield 63
....potential to emit 61
....required fields in applications 59
....trivial emission activities 62
....two-year transition period 61 (please refer to the 8/20/98 update concerning extension to FESOP deadlines)
Pharmaceuticals 90
Photochemically reactive materials 56
Physically and operationally united -
....fuel burning equipment 36
....process equipment 31
Potential to emit 4, 45, 68 & 80
Potential to emit for emergency generators 61
Portable facilities (relocation of) 44
Printing lines 56 & 68
Priorities (for fugitive dust control program) 24
Process equipment 7, 11, 23, 28, 31, 37 & 40
Process weight rate 7, 11, 31 & 47
Product recovery systems 37 & 47
Product separation systems 37
Q
Quarrying operations 10
R
Rack dryers 9
Reasonably available control technology/measures (RACT or RACM) -
....coke oven combustion stacks 19
....cost-effectiveness of 46
....fugitive dust sources 24
....grain dryers 9
....highway construction and maintenance projects 57
Relocation (of portable/mobile sources) 44
Registration status 24, 31 & 35
Roadway (unpaved) 50 & 54
Rounding off 23
S
Sampling runs 51
Scheduled maintenance 33
Shutdowns 34
Significant figures 23
Soot-blowing operations 49
Special terms and conditions (of PTO's and variances) 43, 50 & 54
Stand-by equipment (fuel burning equipment) 36
Stone crushing operations 10
Storage tanks -
....fixed roof 5 & 35
....gasoline 12
....registration status 35
Sulfur dioxide (SO2) 2 & 18
Surface coating lines -
....potential to emit 45
....compliance determinations 48
T
Take-back Drugs 90
Thirty-day rolling, weighted average 18
U
Uncontrolled mass rate of emission (UMRE) 28, 31, 37 & 56
Used Oils 50
V
Variances 5, 32, 39, 43 & 56
Visible emissions 13, 14, 15, 16, 17, 20, 24, 32, 56 & 57
Volatile organic compounds -
....content analysis 55
....process fugitive emissions - leak detection 60
W
Waste oils (for dust control) 50
Water (as part of process weight) 7 & 47
   

Cross Reference Index

Ohio Administrative Code (OAC) Rule Applicable Engineering Guide
Number (.pdf or .html)
General Provisions
3745-15-01 26
3745-15-04 16, 17 & 52
3745-15-05 62, 71, 80
3745-15-06 33 & 92
3745-15-07 30 & 54
Particulate Matter Standards
3745-17-01 7, 81
3745-17-03 20, 27, 40, 41, 51 & 56
3745-17-04 25
3745-17-05 30
3745-17-07 13, 14, 15, 17, 20, 32, 56 & 57
3745-17-08 9, 10, 21, 24, 30, 46, 50 & 57
3745-17-09 3, 26 & 40
3745-17-10 17, 19, 23, 29, 36, 41 & 49
3745-17-11 7,11, 23, 28, 31, 37, 40, 47 & 56
Sulfur Dioxide Regulations
3745-18-04 18
3745-18-08 18
CO, Ozone, Hydrocarbon Air Quality Standards and Related Emission Requirements
3745-21-01 4, 39, 45 & 56
3745-21-04 5
3745-21-07 4, 45, 56, 66 & 81
3745-21-08 66
3745-21-09 4, 5, 12, 22, 45, 48, 52, 60 & 66
3745-21-10 8, 55 & 56
3745-21-12 80
Emergency Episode Standards
3745-25-03 64
Permit-to-Install
3745-31-01 69, 80
3745-31-02 1, 29, 34, 44, 60 & 63
3745-31-03 44, 80
3745-31-05 12, 21, 46, 56, 66, 80, 82, 86, 87, 89 & 90
3745-31-25 69
3745-31-34 85
Incinerators
3745-57-47 52
Total Reduced Sulfur
3745-73-04 52
Title V Permits
3745-77 80
3745-77-01 58, 61, 62, 63
3745-77-03 59
3745-77-04 63
3745-77-07 63 & 66
3745-77-08 63
3745-77-11 85
Air Pollution Control Fees
3745-78-02 71