General Permits - Natural Gas Compressor Stations and Similar Facilities

 As a precautionary response to COVID-19, Ohio EPA is currently operating with most staff working remotely. If you are working with our staff on a current project and you know the name of the employee you are working with, email them at firstname.lastname@epa.ohio.gov or call them directly. The Agency website has contact information for every district, division, and office. In order to reach us, please contact Ohio EPA’s main phone line at (614) 644-3020 or the main line for the division or office you are trying to reach.

After March 23, our district offices and Central Office will be temporarily closed and will have increasingly limited ability to receive deliveries, plans, etc. All entities are encouraged to submit plans, permit applications, etc., electronically where there are existing avenues to do so, such as the eBusiness Center (eBiz). Please refer to the list of available services on the main eBiz webpage. We encourage you to make use of all that apply, even if you have not used eBiz in the past. Plans under 25 MB can be emailed. For large plans over 25 MB, entities should work with the reviewer/division to upload via LiquidFiles. Directions for submitting docs via LiquidFiles is available on YouTube. We apologize for the inconvenience and thank you in advance for your understanding.

To report a spill or environmental emergency, contact the spill hotline (800) 282-9378 or (614) 224-0946

The following General Permits have been designed around a typical natural gas mid-stream compressor station within the gathering network leading up to the larger stations in the interstate transmission network. Compressor stations are used by the natural gas industry to pump the gas through the pipeline. In some cases, they also have equipment that removes natural gas liquids and water from the gas before it is pumped. The general permits listed below include the typical equipment found at a natural gas mid-stream compressor station.

If you are applying for general permits for a compressor station, it is important to note that you also have to submit some additional information that (1) demonstrates the project will not trip major new source review requirements, and (2) provides modeling, if necessary, to demonstrate compliance with various air quality requirements.

The additional information needed is explained in the Additional General Permit Guidance for Natural Gas Compressor Stations document.