Storage Piles, Including Load-in, Load-out and Wind-erosion Activities for Facilities With a Maximum Production of 3,000,000 Tons/Year and a Maximum Storage Pile Surface Area Less Than or Equal to 15 Acres - with no voluntary tons/year PE limits (GP 7.3)

These links are used for determining qualification for and/or applying for a model general permit for a storage pile, including load-in, load-out and wind-erosion activities for facilities with a maximum production of 3,000,000 tons/year and a maximum storage pile surface area less than or equal to 15 acres with no voluntary tons/year PE limits.
 

Model general permit

*Terms and Conditions

 

 

Title V (General PTI)

[DOC]

[PDF]

Non-Title V (General PTIO)

[DOC]

[PDF]

Prior Effective Term and Conditions:

 

 

Qualifying Criteria

[DOC]

[PDF]


   

      *Effective July 20, 2015

 

Applying for a general permit

General Permit Application Instructions

[DOC]

[PDF]             

PTI/PTIO Application              

[DOC]
Section 1

[DOC]
Section 2

PTI/PTIO Application Instructions

[DOC]

 

EAC Form 3112 "Storage Piles"

[DOC]

[PDF]
(Form and
instructions)

EAC Form 3112 "Storage Piles" Instructions

[DOC]

 


   

link back to general permits pageSelect another model general permit