Storage Piles, Including Load-in, Load-out and Wind-erosion Activities for Facilities With a Maximum Production of 3,000,000 Tons/Year and a Maximum Storage Pile Surface Area Less Than or Equal to 15 Acres - with no voluntary tons/year PE limits (GP 7.3)
These links are used for determining qualification for and/or applying for a model general permit for a storage pile, including load-in, load-out and wind-erosion activities for facilities with a maximum production of 3,000,000 tons/year and a maximum storage pile surface area less than or equal to 15 acres with no voluntary tons/year PE limits.
*Terms and Conditions
|
|
|
Title V (General PTI)
|
[DOC]
|
[PDF]
|
Non-Title V (General PTIO)
|
[DOC]
|
[PDF]
|
Prior Effective Term and Conditions:
|
|
|
Qualifying Criteria
|
[DOC]
|
[PDF]
|
*Effective July 20, 2015
General Permit Application Instructions
|
[DOC]
|
[PDF]
|
PTI/PTIO Application
|
[DOC]
Section 1
|
[DOC]
Section 2
|
PTI/PTIO Application Instructions
|
[DOC]
|
|
EAC Form 3112 "Storage Piles"
|
[DOC]
|
[PDF]
(Form and
instructions)
|
EAC Form 3112 "Storage Piles" Instructions
|
[DOC]
|
|
Select another model general permit