10-17.9 mmBtu/hr Natural Gas and Oil-fired Boiler, Post 1989 (GP 1.2)

These links are used for determining qualification for and/or applying for a model general permit for a 10-17.9 mmBtu/hr maximum heat input natural gas and No. 2 oil fired boiler that is constructed, modified or reconstructed after June 9, 1989, with the following allowable emissions:

Size of Boiler Max. Heat Input (mmBtu/hr)

Model General Permit No.

Potential to Emit Summary (TPY)

PE (from burning oil)

SO2 (from burning oil)

NOx (from burning oil)

CO (from burning gas)

OC (from burning gas)

10-17.9

GP1.2

0.92

24.87

9.88

6.46

0.85

             

Permits are available in Microsoft Word [DOC] and Adobe Reader [PDF] formats.  

Model general permit

*Terms and Conditions

 

 

Title V (General PTI)

[DOC]

[PDF]

Non-Title V (General PTIO)

[DOC]

[PDF]

Prior Effective Term and Conditions

N/A

N/A

Qualifying Criteria

[DOC]

[PDF]

Example Calculations

[Excel]

[PDF]

     

* Effective Oct. 21, 2004 

Applying for a general permit

General Permit Application Instructions

[DOC]           

[PDF]

PTI/PTIO Application

[DOC]
Section 1

[DOC]
Section 2

PTI/PTIO Application Instructions

[DOC]

 

EAC Form 3101 "Fuel Burning Operations"

[DOC]

[PDF]
(Form and
instructions)

EAC Form 3101 "Fuel Burning
Operations" Instructions

[DOC]

 

     

link back to general permits pageSelect another model general permit